The Cost Calculation Report displays
information about the costs for needed panels and bands as well as operational
costs for parts and material cutting. To reach this section select "Cost
calculation" tab in the main window.
To print the Cost Calculation Report use the "Print" button
from the buttons bar. |
 |
The "Cost Calculation Report" is made up of 5 sections: Total
costs, Material cost, Edge
banding cost, Works cost and Cutting
cost. |
| |
- Total cost - displays
the total costs for each section and the grand total.
 |
| |
Material cost |
- the total cost of materials, that is
the total of the "Total with waste" column in the "Material
cost" grid |
| |
Edge banding cost |
- the total cost of bands, that is the
total of the "Cost" column in the "Edge banding cost"
grid |
| |
Works cost |
- the total cost of works, that is the
total of the "Cost" column in the "Works cost"
grid |
| |
Cutting cost |
- the total cost of material cutting, that
is the total of the "Cost" column in the "Cutting cost"
grid |
| |
Total |
- the grand total, that is the sum of
the previous fields: Material cost + Edge banding cost + Works cost
+ Cutting cost |
|
| |
- Material cost
- displays cost information about used materials and resulted
offcuts.
 |
| |
No. |
- row number |
| |
Material |
- material of the panel |
| |
Length |
- length of the panel |
| |
Width |
- width of the panel |
| |
Qty |
- the qty of used panels |
| |
Price |
- the price of the material, per area unit,
as defined in the Materials
window |
| |
Usage |
- the surface and cost of the used panels
area |
| |
Waste |
- the surface and cost of the waste area.
Waste area is the sum of scrap area and saw waste area |
| |
Total with waste |
- the cost of the material including waste:
(Usage surface x Price) + (Waste surface x Price) Offcuts
cost is not added to this total because offcuts can be reused |
| |
Offcuts |
- the cost or value of reusable offcuts |
|
| |
- Edge banding cost - displays
cost information about the used bands.
 |
| |
No. |
- row number |
| |
Name |
- the name of the band |
| |
Length |
- length of the used band, including overhang,
calculated for all sides of the parts for which the band is set |
| |
Price |
- the price of the band, per length unit,
as defined in the Bands window |
| |
Cost |
- the cost of the band: (Length x Price) |
|
| |
- Works cost - displays
cost information about the operational costs for parts.
 |
| |
No. |
- row number |
| |
Name |
- the name of the works |
| |
Qty |
- the qty of parts for which the works
is set |
| |
Price |
- the price of the works, per part, as
defined in the Works window |
| |
Cost |
- the cost of the works: (Qty x Price) |
|
| |
- Cutting cost - displays
cost information about the cutting operation.
 |
| |
No. |
- row number |
| |
Material |
- material of the panel |
| |
Length |
- cutting length, calculated for all sides
of the parts for which cutting is required |
| |
Price |
- the price of the cutting operation, per
length unit, as defined in the Materials
window |
| |
Cost |
- the cost of the cutting operation: (Length
x Price) |
|
| |